Asset Risk Report | Kinetica Risk
Kinetica_logo

Asset Risk Report

ASTM E3429 Baseline PLUS - SSP585 2031-2060
Asset Name

EnvSciLab

Address

335 River Road, Ottawa, ON

Hazards Evaluated
EarthquakeFloodWind
Net Benefit Through Resilience

$–

  • Quick Summary

    Asset Summary

    IMPACT RATING
    Property Damage
    Moderate
    Tenant Impact
    Extreme
    Safety Risk
    Extreme

    Hazard Summary

    Asset Location
    Select Hazard

    Loss (%) by Hazard

    Average Annualized Loss (AAL)

    Earthquake $66985 ACUTE
    Flood Negligible Risk ACUTE
    Wind $2697 ACUTE

    Loss (%) of Functional Recovery Time

    Average Annualized Func. Recovery Time

    Earthquake 1.22 days ACUTE
    Flood 0.7 days ACUTE
    Wind 7.54 days ACUTE

    Expected Loss by Time Horizon

  • Catastrophic Risk

    Rare Events - 5 year horizon

    Rare Events - 30 year horizon

  • Risk Drivers

    From a direct loss perspective the biggest contributor to Earthquake is Total Loss, the biggest contributor to Wind is B20-Exterior Enclosure, respectively. In some rare, but catastrophic scenarios total loss is a big contributor to one or more of the hazards exposed. Overall structural collapse or other irreparable conditions can both lead to this outcome. Retrofiting structure can be costly, and it is recommended to examine the total loss category in more detail to devise effective mitigation solutions.

    Cost Drivers

    Select Hazard

    {HazardSelectedOption}

    Recovery Bottleneck

    Select Hazard

    {HazardSelectedOption}

  • Details of Property Damage & Functional Recovery

    Detailed Acute Loss Metric Tables

    Loss Metrics by Acute Hazard
    Hazard PML (100-yr) PML (500-yr) AEP OEP TVaR-99%
    Earthquake $0.41M $5.44M $0.00M $0.00M $6.29M
    Flood $0.00M $0.00M $0.00M $0.00M $0.00M
    Wind $0.01M $0.01M $0.01M $0.01M $0.01M

    Functional Recovery Time (days)

    Select Hazard

    {HazardSelectedOption}

    Functional Recovery Gantt Chart
    Select Intensity (by Return Period)

    Options show intensity with corresponding event return period.

    Select Percentile
  • Resilience Options

    Knowledge Enhancement

    5yr Plan

    Conduct baseline+ assessment for EQ.High Value
    Conduct baseline+ assessment for FL.Moderate Value

    30yr Plan

    Conduct comprehensive assessment for EQ.Moderate Value
    Conduct comprehensive assessment for WD.Moderate Value

    Asset Hardening

    5yr Plan

    Harden D10-Conveying components under EQ for 5-yr horizon.Moderate Value
    Harden D30-HVAC components under EQ for 5-yr horizon.Moderate Value

    30yr Plan

    Harden C30-Interior Finishes components under EQ for 30-yr horizon.Moderate Value
    Harden D30-HVAC components under EQ for 30-yr horizon.Moderate Value

    Operational Considerations

    5yr Plan

    Expedite post-EQ recovery/process of inspection for 5-yr horizon.Moderate Value
    Expedite post-EQ recovery/process of contractor mobilization for 5-yr horizon.Moderate Value

    30yr Plan

    Expedite post-EQ recovery/process of inspection for 30-yr horizon.Moderate Value
    Expedite post-EQ recovery/process of contractor mobilization for 30-yr horizon.Moderate Value
Copyright Kinetica

Resilience Measures

Resilience Action Cost Est. Benefit Est. Net Saving BCR
Total

All values shown in $M.