Asset Risk Report | Kinetica Risk

Asset Risk Report

BaselinePLUS - SSP585 2031-2060
Asset Name

AnL

Address

867 Lakeshore Rd, Burlington, ON

Hazards Evaluated
EarthquakeFloodWind
Net Benefit Through Resilience

$–

  • Quick Summary
    Asset Photo
    Building
    Impact Ratings
    IMPACT RATING
    Property Damage
    Low
    Tenant Impact
    Moderate
    Safety Risk
    High
    Asset Location
    Hazard Curve
    Average Annualized Loss (AAL)
    Earthquake $49045 ACUTE
    Flood $19145 ACUTE
    Wind $62 ACUTE
    Average Annualized Functional Recovery Time
    Earthquake 0.65 days ACUTE
    Flood 1.3 days ACUTE
    Wind 1.23 days ACUTE
    Loss (%) by Hazard
    Loss (%) of Functional Recovery Time
    Expected Loss by Time Horizon
  • Catastrophic Risk

    Rare Events - 5 year horizon 95th percentile

    Rare Events - 30 year horizon 95th percentile

  • Risk Drivers

    From a direct loss perspective the biggest contributor to Earthquake is F10-Special Construction, the biggest contributor to Flood is D50-Electrical, the biggest contributor to Wind is B30-Roofing, respectively. Component types identified as cost drivers can be targetedly addressed to eliminate or reduce their contribution to the total loss.

    Cost Driver by Component Class
    Select Hazard

    {HazardSelectedOption}

    Recovery Bottleneck by Task
    Select Hazard

    {HazardSelectedOption}

  • Details of Property Damage & Functional Recovery
    Loss Metrics for Acute Hazards
    Hazard PML (100-yr) PML (500-yr) AEP OEP TVaR-99%
    Earthquake $0.23M $2.86M $0.00M $0.00M $3.52M
    Flood $0.00M $0.00M $0.00M $0.00M $0.63M
    Wind $0.00M $0.00M $0.00M $0.00M $0.00M
    Select Hazard

    {HazardSelectedOption}

    Functional Recovery Gantt Chart
    Select Intensity (by Return Period)

    Options show intensity with corresponding event return period.

    Select Percentile
  • Resilience Options

    Knowledge Enhancement

    5-yr Plan
    Conduct baseline+ assessment for EQ.High Value
    Conduct baseline+ assessment for FL.Moderate Value
    30-yr Plan
    Conduct comprehensive assessment for EQ.Moderate Value
    Conduct comprehensive assessment for FL.Moderate Value

    Asset Hardening

    5-yr Plan
    Harden D10-Conveying components under EQ for 5-yr horizon.Moderate Value
    Harden D50-Electrical components under FL for 5-yr horizon.Moderate Value
    30-yr Plan
    Harden C30-Interior Finishes components under EQ for 30-yr horizon.Moderate Value
    Harden D10-Conveying components under EQ for 30-yr horizon.Moderate Value

    Operational Considerations

    5-yr Plan
    Expedite post-EQ recovery/process of inspection for 5-yr horizon.Moderate Value
    Expedite post-EQ recovery/process of contractor mobilization for 5-yr horizon.Moderate Value
    30-yr Plan
    Expedite post-EQ recovery/process of inspection for 30-yr horizon.Moderate Value
    Expedite post-EQ recovery/process of contractor mobilization for 30-yr horizon.Moderate Value
Copyright Kinetica Risk

Resilience Measures

Resilience Action Cost Est. Benefit Est. Net Saving BCR
Total

All values shown in $M.