Asset Risk Report

ASTM E3429 Baseline - SSP585 2031-2060
Asset Name

AnL

Address

XXXX Lakeshore Rd, Burlington, ON

Hazards Evaluated
EarthquakeFloodWind
Net Benefit Through Resilience

$–

  • Quick Summary

    Asset Summary

    IMPACT RATING
    Property Damage
    Low
    Tenant Impact
    High
    Safety Risk
    High

    Hazard Summary

    Asset Location
    Select Hazard

    Loss (%) by Hazard

    Average Annualized Loss (AAL)

    Earthquake $48911 ACUTE
    Flood $13647 ACUTE
    Wind $538 ACUTE

    Loss (%) of Functional Recovery Time

    Average Annualized Func. Recovery Time

    Earthquake 0.65 days ACUTE
    Flood 1.16 days ACUTE
    Wind 3.21 days ACUTE

    Expected Loss by Time Horizon

  • Catastrophic Risk

    Rare Events - 5 year horizon

    Rare Events - 30 year horizon

  • Risk Drivers

    From a direct loss perspective the biggest contributor to Earthquake is F10-Special Construction, the biggest contributor to Flood is D50-Electrical, the biggest contributor to Wind is B20-Exterior Enclosure, respectively. Component types identified as cost drivers can be targetedly addressed to eliminate or reduce their contribution to the total loss.

    Cost Drivers

    Select Hazard

    {HazardSelectedOption}

    Recovery Bottleneck

    Select Hazard

    {HazardSelectedOption}

  • Details of Property Damage & Functional Recovery

    Detailed Acute Loss Metric Tables

    Loss Metrics by Acute Hazard
    Hazard PML (100-yr) PML (500-yr) AEP OEP TVaR-99%
    Earthquake $0.23M $2.94M $0.04M $0.04M $5.37M
    Flood $0.00M $0.00M $0.00M $0.00M $0.51M
    Wind $0.00M $0.02M $0.00M $0.00M $0.01M

    Functional Recovery Time (days)

    Select Hazard

    {HazardSelectedOption}

    Functional Recovery Gantt Chart
    Select Intensity (by Return Period)

    Options show intensity with corresponding event return period.

    Select Percentile
  • Resilience Options

    Knowledge Enhancement

    5yr Plan

    Conduct baseline+ assessment for EQ.High Value
    Conduct baseline+ assessment for FL.Moderate Value

    30yr Plan

    Conduct comprehensive assessment for EQ.Moderate Value
    Conduct comprehensive assessment for WD.Moderate Value

    Asset Hardening

    5yr Plan

    Harden D10-Conveying components under EQ for 5-yr horizon.Moderate Value
    Harden D50-Electrical components under FL for 5-yr horizon.Moderate Value

    30yr Plan

    Harden C30-Interior Finishes components under EQ for 30-yr horizon.Moderate Value
    Harden D10-Conveying components under EQ for 30-yr horizon.Moderate Value

    Operational Considerations

    5yr Plan

    Expedite post-EQ recovery/process of inspection for 5-yr horizon.Moderate Value
    Expedite post-EQ recovery/process of contractor mobilization for 5-yr horizon.Moderate Value

    30yr Plan

    Expedite post-EQ recovery/process of inspection for 30-yr horizon.Moderate Value
    Expedite post-EQ recovery/process of contractor mobilization for 30-yr horizon.Moderate Value
Copyright Kinetica

Resilience Measures

Resilience Action Cost Est. Benefit Est. Net Saving BCR
Total

All values shown in $M.